HYDROCON ENTERPRISE SDN BHD Discuss your project
All systems, by building zone

Industrial and Car Park Flooring.

Factory floors, loading bays, car parks and plant rooms. Forklifts, chemicals and hot wash-downs, on a floor that has to stay seamless and cleanable. This page sets out what the slab needs, the layers and the order of work.

The build-up.

Four layers over the structural slab.

From the slab up

  1. Substrate preparationShot-blasted or ground, moisture checked. The slab must be sound, clean and free of oil before any primer goes on.
  2. EPIPRIMEEpoxy primer, applied by roller.
  3. EPILOX 246 SL, two coatsSolvent-free, self-levelling epoxy resin coating. Heavier duty takes EPILOX 246 EM epoxy mortar underneath, with the two coats over it.
  4. EPITHANE CPS top coatPolyurethane top coat. On car park decks it is the wearing coat, straight over the primer.
The industrial floor build-up drawn exploded: slab, prepared substrate, epoxy primer, the self-levelling epoxy coats and the polyurethane top coat with a bay line

How the job runs.

  1. We check the slabConcrete or screed of at least 25 N/mm², with its moisture checked, and free of oil, paint and loose material.
  2. Surface preparationVacuum shot-blasting is preferred. Planing, grit blasting or grinding are used where they suit, until the surface shows a profile.
  3. EPIPRIMEThe epoxy primer goes on by roller, within its pot life and without thinning.
  4. Two coats of EPILOX 246 SLThe self-levelling epoxy goes on in two coats over the primer. On a heavier-duty floor, EPILOX 246 EM epoxy mortar is trowelled on at 3 to 6 mm first, and the two coats go over it.
  5. EPITHANE CPS top coatThe polyurethane top coat is applied within its pot life and spike-rolled at once to release air.

Car parks, joints and ramps.

Materials.

  • EPIPRIME

    Epoxy primer for concrete and screeds.

  • EPILOX 246 SL

    Two-part, solvent-free, self-levelling epoxy resin coating, in two coats.

  • EPILOX 246 EM

    Three-component, solvent-free epoxy mortar, trowelled on at 3 to 6 mm, for heavier duty.

  • EPITHANE CPS

    Polyurethane coating: the top coat on factory floors and the wearing coat on car park decks.

  • HG 202

    Non-metallic dry-shake floor hardener, power-floated into fresh concrete.

These products are made by CHEMIND. Where a project specifies another manufacturer's system, we apply that instead.

Questions we are asked.

What goes on a factory floor?
EPIPRIME on the prepared concrete, then two coats of EPILOX 246 SL, then an EPITHANE CPS top coat.
What does the slab need before you start?
Concrete or screed of at least 25 N/mm², clean and free of oil. We check the moisture before any primer goes on.
How is the surface prepared?
By vacuum shot-blasting where possible, or by planing, grit blasting or grinding, until the surface shows a profile.
What goes under a heavier-duty floor?
EPILOX 246 EM epoxy mortar, trowelled on at 3 to 6 mm, with the two coats of EPILOX 246 SL over it.
What do you lay in car parks?
EPITHANE CPS, in at least two coats, straight over EPIPRIME on the prepared concrete. The O-ring pattern on the ramps is formed by others.

Talk to us about flooring.

Phone and WhatsApp016-332 7534

Emailinfo@hydrocon.com.my

Send us the outline and we will call you back.

Both open on your own phone or computer with the message written out. Nothing is stored on this site.