Industrial and Car Park Flooring.
Factory floors, loading bays, car parks and plant rooms. Forklifts, chemicals and hot wash-downs, on a floor that has to stay seamless and cleanable. This page sets out what the slab needs, the layers and the order of work.
The build-up.
Three layers over the structural slab.
From the slab up
- Substrate preparationShot-blasted or ground, moisture checked. The slab must be sound, clean and free of oil before any primer goes on.
- EPIPRIMEEpoxy primer, applied by roller.
- EPITHANE CPSMedium-duty polyurethane self-levelling screed. Heavier duty takes EPILOX 246 epoxy mortar underneath; car parks take a floor hardener or a PU deck coating instead.
How the job runs.
- We check the slabConcrete or screed of at least 25 N/mm², with its moisture checked, and free of oil, paint and loose material.
- Surface preparationVacuum shot-blasting is preferred. Planing, grit blasting or grinding are used where they suit, until the surface shows a profile.
- EPIPRIMEThe epoxy primer goes on by roller, within its pot life and without thinning.
- EPILOX 246, under heavy-duty floorsThe epoxy mortar is trowelled on at 3 to 6 mm before the wearing coat.
- EPITHANE CPSThe polyurethane coat is applied within its pot life and spike-rolled at once to release air.
Joints, ramps and car parks.
- Moving joints
Every moving joint in the slab is carried through the floor finish. See expansion and construction joints.
- Car park decks
A non-metallic floor hardener is spread onto the fresh concrete and power-floated in.
- Car park ramps
O-ring patterns are formed in the surface of the ramp while the concrete is fresh.
- Curing
A power-floated slab cures for at least seven days before it is loaded.
Materials.
- EPIPRIME
Epoxy primer for concrete and screeds.
- EPILOX 246
Three-component, solvent-free epoxy mortar, trowelled on at 3 to 6 mm.
- EPITHANE CPS
Polyurethane floor system, the wearing coat.
- Floor hardener
Non-metallic dry-shake hardener for car park decks and ramps.
These products are made by CHEMIND. Where a project specifies another manufacturer's system, we apply that instead.
Questions we are asked.
- What does the slab need before you start?
- Concrete or screed of at least 25 N/mm², clean and free of oil. We check the moisture before any primer goes on.
- How is the surface prepared?
- By vacuum shot-blasting where possible, or by planing, grit blasting or grinding, until the surface shows a profile.
- What goes under a heavy-duty floor?
- EPILOX 246 epoxy mortar, trowelled on at 3 to 6 mm, under the wearing coat.
- What do you lay in car parks?
- A floor hardener power-floated into the fresh concrete, or a polyurethane deck coating.
Talk to us about flooring.
Phone and WhatsApp016-332 7534
Emailinfo@hydrocon.com.my