Industrial and Car Park Flooring.
Factory floors, loading bays, car parks and plant rooms. Forklifts, chemicals and hot wash-downs, on a floor that has to stay seamless and cleanable. This page sets out what the slab needs, the layers and the order of work.
The build-up.
Four layers over the structural slab.
From the slab up
- Substrate preparationShot-blasted or ground, moisture checked. The slab must be sound, clean and free of oil before any primer goes on.
- EPIPRIMEEpoxy primer, applied by roller.
- EPILOX 246 SL, two coatsSolvent-free, self-levelling epoxy resin coating. Heavier duty takes EPILOX 246 EM epoxy mortar underneath, with the two coats over it.
- EPITHANE CPS top coatPolyurethane top coat. On car park decks it is the wearing coat, straight over the primer.
How the job runs.
- We check the slabConcrete or screed of at least 25 N/mm², with its moisture checked, and free of oil, paint and loose material.
- Surface preparationVacuum shot-blasting is preferred. Planing, grit blasting or grinding are used where they suit, until the surface shows a profile.
- EPIPRIMEThe epoxy primer goes on by roller, within its pot life and without thinning.
- Two coats of EPILOX 246 SLThe self-levelling epoxy goes on in two coats over the primer. On a heavier-duty floor, EPILOX 246 EM epoxy mortar is trowelled on at 3 to 6 mm first, and the two coats go over it.
- EPITHANE CPS top coatThe polyurethane top coat is applied within its pot life and spike-rolled at once to release air.
Car parks, joints and ramps.
- Car park decks
EPITHANE CPS goes straight onto the primer, in at least two coats, as the whole wearing coat.
- Car park ramps
O-ring patterns are formed in the surface of the ramp while the concrete is fresh. By others.
- Moving joints
Every moving joint in the slab is carried through the floor finish. See expansion and construction joints.
- Hardened concrete
Where the concrete itself is the finish, HG 202 non-metallic floor hardener is spread onto the fresh concrete and power-floated in.
- Curing
A power-floated slab cures for at least seven days before it is loaded.
Materials.
- EPIPRIME
Epoxy primer for concrete and screeds.
- EPILOX 246 SL
Two-part, solvent-free, self-levelling epoxy resin coating, in two coats.
- EPILOX 246 EM
Three-component, solvent-free epoxy mortar, trowelled on at 3 to 6 mm, for heavier duty.
- EPITHANE CPS
Polyurethane coating: the top coat on factory floors and the wearing coat on car park decks.
- HG 202
Non-metallic dry-shake floor hardener, power-floated into fresh concrete.
These products are made by CHEMIND. Where a project specifies another manufacturer's system, we apply that instead.
Questions we are asked.
- What goes on a factory floor?
- EPIPRIME on the prepared concrete, then two coats of EPILOX 246 SL, then an EPITHANE CPS top coat.
- What does the slab need before you start?
- Concrete or screed of at least 25 N/mm², clean and free of oil. We check the moisture before any primer goes on.
- How is the surface prepared?
- By vacuum shot-blasting where possible, or by planing, grit blasting or grinding, until the surface shows a profile.
- What goes under a heavier-duty floor?
- EPILOX 246 EM epoxy mortar, trowelled on at 3 to 6 mm, with the two coats of EPILOX 246 SL over it.
- What do you lay in car parks?
- EPITHANE CPS, in at least two coats, straight over EPIPRIME on the prepared concrete. The O-ring pattern on the ramps is formed by others.